Zhengzhou 300t/h construction waste treatment line

Applicable materials: construction waste
Processing capacity: 300 tons/hour

Send EmailOnline Chat
introduce

The treatment of construction waste in China has always been a major obstacle to urban development, but it is also a mineral resource for urban development. Resource utilization is the way out for construction waste. The customer is mainly engaged in urban demolition, and the previous construction waste is generally stacked in the open air. Now it can be directly used for new projects after recycling. The resource utilization of construction waste can be well treated, and it has good economic benefits as well as environmental benefits.

Detailed configuration

According to the characteristics of construction waste and customer needs, Longbo has equipped the operation process of crawler type mobile crushing station for coarse crushing+crawler type screening mobile fine crushing station for customers. After screening, the crushed sand aggregate can directly obtain finished materials of different specifications.

configuration list

Advantage

Customer Case

Jiangxi 500000 square river pebble sand production line project
Jiangxi 500000 square river pebble sand production line project ...Read more
Marble crushing processing site in Jinan, Shandong ...Read more
Marble crushing processing site in Jinan, Shandong
Quick Way to Get Price

Welcome to fill in the following form, leave your requirements, phone number, equipment use and other information, and describe your requirements in details as far as possible.

Copyright © 2006 by Henan Langbo Machinery Manufacturing Co., Ltd. 豫ICP备2022026438号 Design:zzqmwl